Sign In
  • U.S.
  • International
  • Canada
  • Espau00f1ola
Latest World News Update
  • Home
  • Business
  • National
  • Entertainment
  • Sports
  • Health
  • Science
  • Tech
  • World
  • Marathi
  • Hindi
  • Gujarati
  • videos
  • Press Release
    • Press Release
    • Press Release Distribution Packages
  • Live Streaming
  • Legal Talk
Reading: 136 Vande Bharat trains serving aspirational Indians with modern comfortable rail travel – World News Network
Share
Latest World News UpdateLatest World News Update
Font ResizerAa
Search
  • Home
    • Home 1
  • Categories
  • Legal Talk
  • Bookmarks
  • More Foxiz
    • Sitemap
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Latest World News Update > Blog > Business > 136 Vande Bharat trains serving aspirational Indians with modern comfortable rail travel – World News Network
Business

136 Vande Bharat trains serving aspirational Indians with modern comfortable rail travel – World News Network

worldnewsnetwork
Last updated: December 29, 2024 12:00 am
worldnewsnetwork
Share
SHARE

New Delhi [India], December 29 (ANI): Indian Railways continued its transformative journey in the year 2024, paving the way for a new era of modernization and progress. With a strong focus on meeting world-class travel experience, boosting freight efficiency, and adopting advanced technologies, the Railways has solidified its role as a catalyst for national growth.
As of December 26, a total of 136 flagship Made in India Vande Bharat trains are running across the Indian Railways network. During the Calendar year 2024 itself, as many as 62 Vande Bharat services were introduced, the Ministry of Railways said in a year-end statement.
The semi-high-speed train, Vande Bharat trains have become a symbol of India’s aspirations for modern, efficient, and comfortable rail travel.
These trains are equipped with top-tier amenities and advanced safety features, such as Kavach technology, 360-degree rotating seats, accessible toilets for Divyangjan, and integrated Braille signages, among many others.
Besides, Indian railways have electrified 3,210 kms of rail track during the calendar year 2024. The broad gauge network of railway electrification has been extended to 97 per cent.
As part of the modernisation of railway stations, the ‘Amrit Bharat Station Scheme’, as many as 1,337 stations have been identified for redevelopment. Out of 1,337 stations, tenders have been awarded and work has commenced in 1,198 railway stations. Other railway stations are at different stages of tendering and planning.
Indian Railways, which has set a target of becoming a Net Zero Carbon Emitter by 2030, has as of November commissioned approximately 487 MW of solar plants (both rooftop and ground-mounted) and about 103 MW of wind power plants.
Total Capex for the Indian Railways in 2024-25 is Rs 2,65,200 cr, which is the highest amount allocated in the budget.
E-ticketing has touched 86 per cent in the reserved sector. E-ticketing in the unreserved sector has gone up from 28 per cent at the beginning of the current financial year to around 33 per cent in October 2024.
In order to boost investment from industry in setting up of cargo terminals, ‘Gati Shakti Multi-Modal Cargo Terminals (GCT) are being developed across the country. So far, 354 locations (327 on non-railway land and 27 on railway land) have been identified across the country.
Till October, 91 such terminals have been commissioned.
Three Economic Corridors were also sanctioned in 2024: Energy, Mineral and Cement Corridors; High Traffic Density Routes; and Rail Sagar corridors.
A total of 434 projects have been planned for implementation under these three corridors. In the calendar year 2024, a total of 58 projects out of total of 434 projects were sanctioned across three economic corridors, with a combined completion cost of about Rs 88,875 crore and a total track length of about 4,107 kilometres.
The Energy, Mineral and Cement Corridors accounted for 51 projects, spanning 2,911 kilometres with a completion cost of Rs 57,313 crore.
The High Traffic Density Routes included 5 projects, covering about 830 kilometres and costing about Rs. 11,280 crore.
The Rail Sagar corridor had 2 projects, with a total track length of about 366 kilometres and a completion cost of about Rs. 20,282 crore. (ANI)

Contents
WORLD MEDIA NETWORKPRESS RELEASE DISTRIBUTIONPress releases distribution in 166 countriesPress releases in all languagesPress releases in Indian LanguagesIndia PackagesEurope PackagesAsia PackagesMiddle East & Africa PackagesSouth America PackagesUSA & Canada PackagesOceania PackagesCis Countries PackagesWorld Packages

Disclaimer: This story is auto-generated from a syndicated feed of ANI; only the image & headline may have been reworked by News Services Division of World News Network Inc Ltd and Palghar News and Pune News and World News

sponsored by

WORLD MEDIA NETWORK


PRESS RELEASE DISTRIBUTION

Press releases distribution in 166 countries

EUROPE UK, INDIA, MIDDLE EAST, AFRICA, FRANCE, NETHERLANDS, BELGIUM, ITALY, SPAIN, GERMANY, AUSTRIA, SWITZERLAND, SOUTHEAST ASIA, JAPAN, SOUTH KOREA, GREATER CHINA, VIETNAM, THAILAND, INDONESIA, MALAYSIA, SOUTH AMERICA, RUSSIA, CIS COUNTRIES, AUSTRALIA, NEW ZEALAND AND MORE

Press releases in all languages

ENGLISH, GERMAN, DUTCH, FRENCH, PORTUGUESE, ARABIC, JAPANESE, and KOREAN CHINESE, VIETNAMESE, INDONESIAN, THAI, MALAY, RUSSIAN. ITALIAN, SPANISH AND AFRICAN LANGUAGES

Press releases in Indian Languages

HINDI, MARATHI, GUJARATI, TAMIL, TELUGU, BENGALI, KANNADA, ORIYA, PUNJABI, URDU, MALAYALAM
For more details and packages

Email - support@worldmedianetwork.uk
Website - worldmedianetwork.uk

India Packages

Read More

Europe Packages

Read More

Asia Packages

Read More

Middle East & Africa Packages

Read More

South America Packages

Read More

USA & Canada Packages

Read More

Oceania Packages

Read More

Cis Countries Packages

Read More

World Packages

Read More
sponsored by
Subscribe to Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]
Share This Article
Twitter Email Copy Link Print
Previous Article China expands nationwide detention facilities as Xi Jinping intensifies anti-corruption campaign – World News Network
Next Article “Keeping an eye on Bangladesh”: West Bengal DGP on cross-border infiltration – World News Network
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Editor's Pick

Top Writers

Oponion

You Might Also Like

Assam CM inaugurates TVS Credit Technology Centre in Guwahati – World News Network

As an extension of the Advantage Assam 2.0 initiative and a result of the MoU signed in February, 2025, Assam…

3 Min Read

Labour Codes can significantly boost women’s workforce participation in India: Report – World News Network

The recently notified four labour Codes, effective from November 21, 2025, have the potential to meaningfully expand women's participation in…

4 Min Read

M3M Foundation Strengthens Education Along the Line of Control: Extends Comprehensive Infrastructure Support to Four Schools in Poonch – World News Network

Poonch (Jammu and Kashmir) [India], December 13: Reaffirming its commitment to equitable access to education in India's most vulnerable geographies,…

4 Min Read

The much-awaited 2025 season of Chilean cherries has arrived, bringing the freshest and most delicious cherries to markets across India – World News Network

New Delhi [India], December 13: Known for their vibrant red colour, unmatched sweetness, and juicy bite, Chilean cherries are the…

2 Min Read
Latest World News Update
Copyright © 2024 World News Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Lost your password?